Daytime work will continue (7AM – 3PM, Monday–Friday)

  • Both northbound and southbound traffic lanes shifted to the right shoulder to create work areas for median barrier replacement between Exits 14-15 (former Exits 18-19) and Exits 15-17 (former Exits 19-20).
  • Median barrier and median drainage are underway.
  • Ramp and shoulder drainage repair will continue throughout, northbound, and southbound from Exit 12B-Exit 18 (former Exits 15-22).

Night work will continue (6PM – 6AM, Monday–Thursday)

  • Traffic pattern remains the same (both directions shifted to the right shoulder).
  • Continued median barrier and drainage work.

Why is Route 8 asphalt being removed? Visit our FAQ page by clicking here to find out.

Photo of installation of new precast median barrier

Installation of permanent precast median barrier 