Skip to main content

Sign Up For Our Email List

To receive construction project updates, alerts and invites for future meetings directly in your inbox join our email list by subscribing.

Name(Required)
This field is for validation purposes and should be left unchanged.
Sign Up for Email Alerts
Route 8 Design BuildRoute 8 Design Build
Menu
  • Home
  • About the Project
    • Overview / Funding
    • Project Plans
    • Key Personnel
  • Public Information
  • News & Resources
    • Project Photos
    • Articles / Interviews
    • Latest News
  • Contact
  • Construction Alerts
Construction Alerts

Photos March 2023 to December 2023

  1. Home
  2. Project Photos
  3. Photos March 2023 to December 2023
Temporary lane reduction on the ramp at Exit 17 on Route 8
Temporary lane reduction on the on ramp to Route 8
Barrels indicating the temporary shoulder closure on Route 8 SB in the Exit 17 vicinity
Barrels indicating the temporary shoulder closure on Route 8 SB in the Exit 17 vicinity for clearing and grubbing activities
Drainage structures at Exit 15 SB on Route 8
Base for future illumination fixture on Route 8
Electrical trenching and backfilling for new illumination circuits near Exit 13 on Route 8 NB
Aerial view of Route 8 in the fall of 2024
Paving operations on Route 8, fall, 2023
Paving operations on Route 8, fall, 2023
Paving operations on Route 8, fall, 2023
Paving operations on Route 8, fall, 2023
Paving operations on Route 8, fall, 2023
Excavator for initial drainage work, fall 2023
Workers conducting preliminary drainage work, fall 2023
Excavator for initial drainage work, fall 2023
Excavator for initial drainage work, fall 2023
Rock face adjacent to Route 8 and metal beam rail
Worker installing illumination fixture