For the Thanksgiving Holiday week, Night shift will be working Sunday-Tuesday and Day shift will be working Monday-Wednesday.
Work will continue during the daytime, 7AM to 3PM, Monday through Friday. For the holiday week, work will continue 7AM to 3PM Monday through Wednesday.
- Both northbound and southbound traffic lanes have moved to the right shoulder to create work areas for median barrier replacement between Exits 15 and 17, (former Exits 19 and 20), Exits 17 and 18 (former Exits 20 and 22), and Exit 18 (former Exit 22).
- Median barrier and median drainage are being replaced.
- Ramp and shoulder drainage repair will continue throughout, northbound, and southbound from Exit 12B to Exit 18 (former Exits 15 and 22).
Nighttime work will continue from 6PM to 6AM Sunday through Thursday nights regularly. For the holiday week, work will continue 6PM to 6AM Sunday through Tuesday night.
- Concrete pavement repair will cease for the winter season. Temporary Barrier will be moved throughout the project limits and preparation for other work items will continue.