Work will continue during the daytime, 7AM to 3PM, Monday through Friday.

  • Both northbound and southbound traffic lanes have moved to the right shoulder to create work areas for median barrier replacement between Exits 14-15 (former Exits 18-19) and Exits 15-17 (former Exits 19-20).
  • Median barrier and median drainage are being replaced.
  • Ramp and shoulder drainage repair will continue throughout, northbound, and southbound from Exit 12B-Exit 18 (former Exits 15-22).

Work will continue during the Night shift, 6PM to 6AM, Monday through Thursday.

  • Both northbound and southbound traffic lanes have moved to the right shoulder to create work areas for median barrier replacement between Exits 14-15 (former Exits 18-19) and Exits 15-17 (former Exits 19-20).
  • Median barrier and median drainage are being replaced.

Why is Route 8 asphalt being removed? Click to visit our FAQ page to find out.

Photo of construction vehicle and excavator for median work
Construction vehicle and excavator for median work
Previous Post
Update for the Weeks of March 2, 9, and 16, 2026